Decreases flat time and total expenses by taking cementing off the rig
Increases operational efficiencies as utilization of rig is fully maximized
Meets cellar height restrictions
Superior service quality and unparalleled engineering expertise
Improves per-rig drilling efficiency, reduces cycle time, and lowers total well cost
Improves safety
Reduces NPT
Reduce NPT 8-10 hours saved per cycle time
Total savings of $1.9 million
A Fortune 500 energy corporation realized that a significant amount of Non-Productive Time (NPT) it was experiencing on a 60-well pad operation in South Texas was tied to crew waiting on cement to set. In an effort to reduce flat time, optimize drilling efficiency, and reduce cycle time, the operating company engaged SPM™ Oil & Gas (SPM™) to engineer a solution to take the cementing portion of the simultaneous operation safely off the critical path.
With multi-well pad drilling, NPT is common while crews wait on each other to complete each operation. Taking activities off the critical path can reduce NPT and create greater efficiencies that generate significant cost savings.
SPM’s team of engineers worked closely with the operating company’s drilling experts to successfully design a compact, reliable, and safe system that meets cellar height requirements and attaches to SPM’s S-29 ULR Wellhead to enable offline cementing for production casing. The SPM team installed the offline cementing system at the wellsite, and then the company’s cementing crew successfully connected its cement head to the system and completed the cementing operation
SPM’s Offline Cementing Solution for the operator resulted in a significant reduction in NPT and cost savings. As a result, the operator applied SPM’s Offline Cementing Service to its additional wells on the site, saving eight-10 hours of cycle time and approximately $32,000 = 8-10 hours simultaneous operations .
SPM’s Offline Cementing Service safely takes the cementing process off the critical path of the rig so that operators engaged in simultaneous, multi-well pad operations can reduce the risk of NPT, improve drilling efficiency, decrease cycle time, and lower their overall CAPEX. This method allows operators to skid over to the next well to begin rigging up while another well is cementing casing strings offline. Conventional cementing on a rig equates to approximately $10,000/hour whereas offline cementing designed for multi-well pad operations costs approximately $3,000/hour.
Oilfield companies require pressure pumping equipment that meets today’s rigorous demands and are paying closer attention to the longevity of parts on site. One of the top consumables, fluid ends, can directly impact the uptime of hydraulic fracturing pumps and support operational efficiency.
Learn MoreSPM™ Oil & Gas, a leading upstream provider of pressure pumping and pressure control equipment and services, announced today an SPM™ WS 335 Frac Pump achieved more than 13,000 pumping hours in the Permian before its first overhaul.
Learn MoreTo support pressure pumping operators in accelerating high-performance hydraulic fracturing applications and doing more with less in tough environments, SPM™ Oil & Gas Product Manager Connor Docherty is working to develop robust pumping solutions that are built to last longer. Learn how his role is making an impact at Caterpillar and beyond.
Learn MoreOilfield companies require pressure pumping equipment that meets today’s rigorous demands and are paying closer attention to the longevity of parts on site. One of the top consumables, fluid ends, can directly impact the uptime of hydraulic fracturing pumps and support operational efficiency.
Learn More